Desktop Plan on a Mac

Desktop Plan on a Mac is the same program as on Windows. Your plans, your licence and everything in this guide work the same way. This chapter covers the few things a Mac does differently: the keys, the menu bar, and installing.

What you need#

  • A Mac with macOS 13 Ventura or later, with Apple silicon or an Intel processor.
  • No internet connection, except to activate a licence or check for updates.

Install Desktop Plan#

  1. Open the downloaded .dmg file.

  2. Drag Desktop Plan into the Applications folder.

  3. Open Desktop Plan from Applications or Launchpad.

If your Mac asks for an administrator’s name and password when you drag it into Applications, and you do not have them, drag it into the Applications folder inside your own home folder instead (make one if there is none). It works the same from there, and updates itself there too.

Updates install themselves from inside the app, as on Windows (chapter 19). If Desktop Plan is run straight from the .dmg instead of from Applications, it cannot update itself: the update bar offers the new .dmg to download instead.

Plans move between Mac and Windows#

A plan saved on a Mac opens on a Windows PC, and the other way round. Double-click a .dplan file in Finder, or drag it onto Desktop Plan in the Dock, to open it.

Your licence#

One licence covers up to three of your own computers, Mac or Windows. Activate it on the Mac the same way as on a PC (chapter 19). Each Mac counts as one computer, and so does each person who signs in to it under their own account.

The menu bar#

On a Mac the menus are in the menu bar at the top of the screen, not in the window.

  • Desktop Plan menu: About Desktop Plan, Settings… (the app’s own settings, which Windows calls App settings), and Quit Desktop Plan.
  • File, Edit, Task, Project, View and Help hold what they hold on Windows.
  • Window: minimise, zoom and full screen.

Save, Undo and Redo stay at the top left of the window.

Keys#

The ⌘ Command key does on a Mac what Ctrl does on Windows. The menus show each shortcut the Mac way.

MacWindowsDoes
⌘NCtrl+NNew plan
⌘OCtrl+OOpen a plan
⌘SCtrl+SSave
⇧⌘SCtrl+Shift+SSave As
⌘WCtrl+WClose the current tab
Ctrl+Tab / Ctrl+Shift+Tabthe sameNext / previous tab
⌘1 … ⌘9Ctrl+1 … Ctrl+9Go to tab 1 … 9
⌘ZCtrl+ZUndo
⇧⌘ZCtrl+Shift+ZRedo
⌘DCtrl+DDuplicate the selected tasks
⌘C / ⌘VCtrl+C / Ctrl+VCopy / paste one column
⌘,(File > App settings)The app’s settings
⌘Q(File > Exit)Quit Desktop Plan
Option+DownAlt+DownOpen the calendar, the priority list or the people list
⌘+scroll, or pinch on the trackpadCtrl+mouse wheelMake the whole plan bigger or smaller
⇧⌘+scroll (over the chart)Ctrl+Shift+mouse wheelZoom the timeline in or out

In a grid cell you are typing in, ⌘Z throws your typing away and puts the cell back as it was, as Esc does (with a cell’s calendar open, the first ⌘Z closes the calendar); press ⌘Z again to undo the last change to the plan. In other boxes, ⌘Z does nothing while you type: press Return (or leave the box) to keep what you typed, and ⌘Z then undoes it as one change.

The keys for building a plan, as Microsoft Project has them, work on a Mac with ⌘ for Ctrl and Option (⌥) for Alt:

MacWindowsDoes
⌘IInsertInsert a task above the selected one
⇧⌘MCtrl+Shift+MAdd a milestone
⌘-Ctrl+-Delete the selected tasks
⌥⇧→ / ⌥⇧←Alt+Shift+Right / LeftIndent / outdent
⌥⇧↑ / ⌥⇧↓Alt+Shift+Up / DownMove up / down
⌘F2 / ⇧⌘F2Ctrl+F2 / Ctrl+Shift+F2Link / unlink the selected tasks
⇧F2Shift+F2Edit the task
⇧⌘KCtrl+Shift+KMark done
⌥⇧- / ⌥⇧= / ⌥⇧8Alt+Shift+- / = / *Collapse / expand a phase, expand all
⇧⌘TCtrl+Shift+TGo to today
⇧⌘F5Ctrl+Shift+F5Show the task in the timeline
⇧⌘= / ⇧⌘-Ctrl+Shift+= / –Zoom the timeline in / out
⌘0Ctrl+0Plan back to 100%
⌘FCtrl+FFind
F3F3Clear the filters
⌘PCtrl+PExport to PDF (on the dashboard or team calendar: that page)
⌥⇧P / ⌥⇧RAlt+Shift+P / RProject details / Resources
F1F1This guide

A Mac has no Insert key, so ⌘I inserts a task. On a Mac laptop the F-keys need fn held down: fn+⌘F2 links tasks, fn+F1 opens this guide.

The keys that move around the grid (arrows, Tab, Enter, Esc, Delete) are the same on both. Most Mac keyboards have no Page Up or Page Down key: hold fn with the up or down arrow instead.

F11 opens the dashboard on Windows. On a Mac, F11 usually shows the desktop, so use View › Dashboard instead.

Questions#

Is anything different apart from the keys? Everything in chapters 1 to 21 works the same on a Mac, apart from the keys in this chapter. Chapters 22 and 23 describe a Windows PC’s network settings; a Mac’s are in System Settings > Network.