User guide
20 of 26

Keyboard shortcuts

Files and tabs#

KeysDoes
Ctrl+NNew plan
Ctrl+OOpen a plan
Ctrl+SSave
Ctrl+Shift+SSave As
Ctrl+WClose the current tab
Ctrl+Tab / Ctrl+Shift+TabNext / previous tab
Ctrl+1 … Ctrl+9Go to tab 1 … 9

Editing#

KeysDoes
Ctrl+ZUndo
Ctrl+Y or Ctrl+Shift+ZRedo
Ctrl+DDuplicate the selected tasks
Ctrl+C / Ctrl+VCopy / paste one column (Task, Start, End or Duration)

Building the plan#

Wherever Microsoft Project has a key for something, Desktop Plan uses the same one. Ctrl+Shift+M, Ctrl+Shift+K, Ctrl+Shift+T, Alt+Shift+P and Alt+Shift+R are Desktop Plan’s own. These work on the selected rows, but not while you are typing in a cell. Holding a key down inserts, deletes or links only once; the Alt+Shift+arrow moves, Undo and Redo repeat as usual.

KeysDoes
InsertAdd a task above the selected row
Ctrl+Shift+MAdd a milestone below the selected row
Ctrl+-Delete the selected tasks
Alt+Shift+RightIndent
Alt+Shift+LeftOutdent
Alt+Shift+Up / Alt+Shift+DownMove the selected rows up / down
Ctrl+F2Link the selected tasks, each to the one below it (finish to start)
Ctrl+Shift+F2Remove the links between the selected tasks (with one task: all its links)
Shift+F2Open the task form
Ctrl+Shift+KMark the selected tasks done (or, if they all are, not done)

If a key can’t act, for example Indent on the first task, nothing happens. Where there is a reason to give, it is shown beside the chart.

Phases, finding and filtering#

KeysDoes
Alt+Shift+-Fold the selected phase (with a task selected: the phase it is in)
Alt+Shift+=Open the selected phase
Alt+Shift+*Open every phase
Ctrl+FGo to Search name or notes
F3Clear the search and the filters

The project#

KeysDoes
Alt+Shift+PProject details
Alt+Shift+RThe Resources panel
Ctrl+PExport to PDF (on the dashboard or team calendar: that page)
F1The user guide, in your browser

Moving around the grid#

KeysDoes
Arrow keysMove one cell
Shift+Up / Shift+DownSelect more rows
Home / EndFirst / last column of the row
Tab / Shift+TabNext / previous cell
Any letter or numberStart typing in the cell, replacing what is there
Enter, F2 or SpaceEdit the cell, keeping what is there (on Done: tick or untick)
Click a selected cell againEdit it in place, keeping what is there
Delete or BackspaceClear the cell, ready to type (on Resources: take everyone off). To delete the row, press Ctrl+-
Alt+DownOpen the calendar, the priority list or the people list
Shift+mouse wheelScroll the grid sideways

While typing in a cell#

KeysDoes
EnterKeep, then move down a row (past rows that cannot be typed into, such as a phase’s Duration)
Shift+EnterKeep, then move up a row
Tab / Shift+TabKeep, then edit the next / previous cell
EscCancel

In the task form, Project details and the Resources panel#

KeysDoes
EnterKeep, then move to the next box, with its contents selected
Shift+EnterKeep, then move to the previous box
Tab / Shift+TabNext / previous box, list or button
EscIn the task form: put back what was there; with nothing typed, close the form. Elsewhere: close

Enter stops only at boxes you type in. It never goes into Notes, where Enter starts a new line. In the Resources panel it stays within one group: a person’s details, the working hours, or the days-off boxes. In Reason, Enter adds the days off.

In the calendar pop-up#

KeysDoes
Arrow keysMove a day, or a week with Up and Down
Page Up / Page DownPrevious / next month
EnterPick the date
EscClose

The chart and the view#

KeysDoes
Alt+Page Up / Alt+Page DownChart back / forward one screen
Alt+Left / Alt+RightChart back / forward one step, like the round arrows
Alt+Home / Alt+EndChart to the start / end of the plan
Ctrl+Shift+TGo to today
Ctrl+Shift+F5Scroll the chart to the selected task
Ctrl+Shift+= / Ctrl+Shift+-Zoom the timeline in / out (Hour … Year)
Ctrl+0Plan size back to 100%
Ctrl+Shift+mouse wheel (over the chart)Zoom the timeline in or out (Hour … Year)
Ctrl+mouse wheelMake the whole plan bigger or smaller (50% … 200%)
Esc while dragging a barCancel the drag
F11Open or close the dashboard page
Esc on the dashboard or team calendarBack to the plan
Chapters
    Esc closes · ← → move between pictures · Actual size lets you scroll around the full screenshot